On Sunday I asked if we would ever get full details of the response to this fire. Well details of the initial response have now been released.
WSFRS say that the first fire engine from Chichester (9 miles away) arrived 16 minutes after the call was received. The second fire engine from Selsey (around 200 metres away) arrived 17 minutes after the call, and the third from Bognor Regis (11 miles away) arrived 18 minutes after the initial call.
It is good that they have come clean on these times, as they did fail to meet their own generous response standard. For parts of Selsey the response should be one fire engine within 12 minutes and the second within 15 minutes. There is no explanation about the unusually long time it took the Selsey crew to arrive. Although they are Retained Duty System firefighters, they would still normally be on the road within 5 minutes.
Would a quicker response have saved the school? Perhaps not, but we will never know. What is well known though, is that there is a relationship between speed of response and lives and property saved. It must be very concerning for the residents of Selsey to realise that, if it had been a fire in someone's home and they were trapped at that time, help was 16 minutes away.
The report tells us that 14 fire engines, 2 Aerial Ladder Platforms and other specialist vehicles were needed to deal with the incident, but not where they all came from. However, we do know that, as a result of cuts, the first aerial appliance had to come from Southsea (Hampshire), instead of Chichester. We also know that 3 of the 14 fire engines that would have been scheduled to attend ten years ago, have also been cut.
With extra distances to travel, more time is lost in assembling adequate resources. Did that result in more damage being caused? Again we don't know, but time is precious when trying to stop fires spreading.
This blog is aimed at highlighting the effect of cuts to West Sussex Fire and Rescue Service.
Tuesday, 23 August 2016
Sunday, 21 August 2016
Is "Safer in our hands" just rhetoric?
Over the past week, we have seen a number of fires that have stretched the inadequately resourced fire & rescue service in West Sussex.
Four fire engines were required in Lancing, and they had to come from Shoreham, Worthing, Storrington and East Sussex.
Six fire engines were needed at a fire in Billingshurst, and they came from Horsham, Worthing, Storrington, Partridge Green, Crawley and Arundel.
Overlapping that call was a fire in Crawley Down, which also needed six fire engines. They came from East Grinstead and Burgess Hill, plus four from Surrey Fire & Rescue Service.
Four fire engines were required in Lancing, and they had to come from Shoreham, Worthing, Storrington and East Sussex.
Six fire engines were needed at a fire in Billingshurst, and they came from Horsham, Worthing, Storrington, Partridge Green, Crawley and Arundel.
Overlapping that call was a fire in Crawley Down, which also needed six fire engines. They came from East Grinstead and Burgess Hill, plus four from Surrey Fire & Rescue Service.
A vehicle fire in Pulborough was apparently dealt with by a crew from East Wittering, who were at Storrington to cover a shortage of local crews. Firefighters being taken from the communities they joined to protect, to protect others many miles away is sadly now a daily occurrence.
Today we have a major fire at Selsey requiring at least ten fire engines. We don't yet know where they have come from, but the local grapevine in Selsey is rife with complaints about how long it took for the fire service to arrive. This suggests that the Selsey fire engine did not have a crew, or was otherwise unavailable. Unconfirmed reports suggest that Chichester were the first crew to arrive, that Arundel were the third and that there are four crews there from Hampshire.
As I say, the Selsey information is as yet unconfirmed, but given West Sussex County Council's neglect of the service I would not be surprised if the information turns out to be correct. Will we ever get full details? Possibly, but there has been an increasing reluctance to give details that may inform the public of the inadequate protection they are getting.
So what do we get from West Sussex County Council. We get press releases about "Hundreds pledge support to council’s campaign to keep fire service". Sadly ironic when you consider that West Sussex County Council rejected a petition, signed by 'thousands' last year, asking them not to cut the fire & rescue service.
There is no evidence yet that the service will be safer under the Police & Crime Commissioner's control, but West Sussex County Council's record is far from good. They have closed fire stations, cut a quarter of the County's fire engines, failed to improve crewing of those that remain, and are failing to meet response times for one in four serious incidents.
Government figures, released this week, also show that the number of people who died in house fires in West Sussex increased last year, as did the total number of incidents attended.
It does not matter how many people support West Sussex County Council's campaign, as the final decision will be taken by the Home Secretary. Unless Louise Goldsmith drops her meaningless rhetoric about "we know it delivers the very best for our communities", and replaces it with evidence that they can meet the government's objectives, I fear the Police & Crime Commissioner will get her way.
Wednesday, 3 August 2016
Consultation - West Sussex Fire & Rescue Service Community Risk Management Plan
Well I have submitted my response to the West Sussex Fire & Rescue Service consultation, which closes on Friday this week. The 'additional comments' (item 2) are reproduced below and if anyone wishes to include any of the text in their response, then please feel free to do so.
"This document does not meet the requirements of an Integrated
Risk Management Plan (IRMP), and even fails to deliver as a Community Risk
Management Plan. Much of the information in the document may be useful in a
general information brochure, but the absence of key information on the
outcomes of the last IRMP and plans for dealing with future risk makes this an
inadequate IRMP.
Despite a statement that ‘Station Profile’ and ‘County
Profile’ documents are produced each year and are available on the website, I
have been unable to find them on the website. Even a search for them only
resulted in ‘Sorry, no results were found’ being displayed.
The dubious selection of figures for fire deaths seems intended
to disguise the failure to deliver on the 2010-15 IRMP’s statement that fire
deaths would be reduced. The latest figures, that would show accidental
dwelling fire fatalities for 2015/16, have been omitted and, oddly, figures for
2004/05 have been included. That is presumably to misrepresent the situation by
starting the chart with a particularly high number of fire deaths.
According to Government figures, the actual deaths for the
period of the last IRMP were 28,
compared to the previous five years when there were just 13. So instead of a reduction they have more than doubled.
The 2010-15 IRMP also said that WSFRS would “look at new and
creative options to maintain cover and continue to attract new retained recruits.”
Not only has WSFRS failed to do this, but changes to contracts, training and
management of Retained Duty System (RDS) personnel have made things worse.
Mysteriously, the retained appliance availability target of
88% in 2011/12 has been cut to 75%. Despite the serious implications, this has apparently
been done without any consultation with either the public or with County
Councillors. Yet even this reduced target is not being met and average
availability has fallen from 87% in
2009/10 to 59% last year. Some
stations have even dropped from 100% to just 30% availability during that period.
The failure to address this problem suggests that WSFRS is
happy to allow the retained service to wither and die. This is evidenced by inadequate
efforts to stop the decline and the repeated process of removing lower
availability RDS crewed fire engines from service. Nine have been cut so far.
Clues to the root causes of these failures may be shown in a recent national
survey of RDS firefighters by the Retained Firefighters Union. The results
showed that 69% did not feel their service was doing enough to resolve the
problem, and 60% felt that they were undervalued by Principle Officers.
The only way WSFRS is going to properly tackle the RDS
problem is by working with communities, County Councillors, Parish Councils,
local business and community groups, partner agencies, the South Downs National
Park Authority and others. Much is made of partnership working, yet on
this critical problem WSFRS seems intent on avoiding the involvement of anyone
that may be able to help find new and creative options.
Whilst the Crewing
Optimisation Group may seem a useful interim solution to the RDS
crewing difficulties, it is expensive as a long term solution and fails to
cover all periods of RDS crew shortages. Operating it when there are 12
wholetime crews available, but not operating it when there are only 8 wholetime
crews on duty suggests a lack of planning. Especially as there are times,
during the periods that the Crewing
Optimisation Group is not available, when RDS shortages are as bad as
they are when the Crewing Optimisation
Group is available.
There continues to be an inadequate assessment of risk and
an even more inadequate provision for dealing with it. The last IRMP is claimed
to have resulted in “a considerable reduction in the number of ‘Very High’
Critical Fire risk areas”, yet no evidence can be found to support this claim.
It appears that this may not be an actual reduction of risk, but simply a
slight drop in the number of calls received in some areas.
The risk to individual lives and property remains, and the
risk of losing lives or property is actually greater in areas classed as ‘low
risk’, because it takes longer to get firefighters to those areas. The risk to
life is particularly high in respect of road traffic collisions, with the more
serious ones tending to occur in rural areas. Not only are response times
greater, but WSFRS is failing to meet target times for one in four incidents.
Neither is the provision matched to the risk or the volume
of calls. Crawley continues to be the fire station area requiring the most fire
& rescue service responses in the County. In addition, this document says
that the population in that area is expected to increase by 25%. Yet, WSCC has cut
the number of fire engines and crews in Crawley from five to two. There is a
correlation between population and number of calls, yet this document has no
proposals to deal with an inevitable increase in emergencies in the Crawley
area.
The document states, “We use analytical resources, such as
computer modelling software, to help us predict risk and assess the likely
impact of changes”. Unfortunately, history shows that the results of that
modelling are ignored when it does not suit the Council’s political agenda. Modelling
of proposed changes in 2010 was reported, as it showed no increase in deaths or
property damage. Yet when modelling of the cuts in 2015 showed an increase in
deaths and property damage, efforts were made to disguise and later discredit
the modelling.
It is reassuring that WSFRS recognises the reduction in firefighter
experience of real fires. However, extra training at the Fire Service College
is not enough. The cut in wholetime firefighter numbers and the shortage of
retained firefighters have made it difficult to maintain skills with
continuation training, and at the same time maintain adequate fire cover. In
house training facilities need to be improved and more firefighters must be
employed to enable training facilities to be used without undermining fire
cover.
The document includes the Sussex Control Centre (SCC) in the
list of specialist teams in WSFRS, when in fact the SCC is operated by East
Sussex Fire & Rescue Service (ESFRS). The Control function is effectively
contracted out. No mention is made of the worrying fact that the combined
mobilising system, that was fundamental to the improvement of the control
function, is now three years overdue. ESFRS has refused to state how many times
the combined mobilising system has failed acceptance tests and they have given
no indication of when this problem will be resolved.
Other problems with the SCC are not mentioned, including the
excessive amount of overtime required to maintain minimum staffing levels. In
2015/16, overtime was required on 425 shifts. Of particular concern is that,
unlike the previous WSFRS Fire Control, the SCC does not record mobilising
errors. If they are not recorded, then problems are not being identified and
remedial action cannot be taken.
The document states that around half the incidents attended
by WSFRS were false alarms. It is concerning that this number has been
artificially increased by classifying attendance at some road traffic
collisions as false alarms, simply because no action was required when the
service arrived. To describe an actual road traffic collision that the service
attended as a false alarm is misrepresenting the facts and the work of the
service. Will attendance at actual fires that are out on arrival be the next to
be misrepresented as false?
The document states, “our change in operating model has not
altered the emergency response standards we agreed with you in 2009”. Yet it
fails to inform the public that those standards are not all being met and that
the degree of failure has increased. In particular for both fire engines
arriving at critical fires and for the first fire engine arriving at critical
special services.
The addition of the High Volume Pumping Unit is to be
welcomed, but it does not offset the loss of 11 fire engines. Storms and
flooding primarily require a large number of standard fire engines to respond
to the high volume of emergency calls received in a short space of time. WSFRS
is now less well prepared to respond to the predicted increase in severe
weather events and no improvements are planned.
The claim that this is a ‘Community Risk Management Plan’ is
dubious. Despite fine claims about integration, this document has little or no
mention of the smaller units now controlled by the Chief Fire Officer, the
legislation covering their work, or any plans for their future work. These smaller
departments seem to be completely overshadowed by the fire & rescue service
and their effectiveness seems to have suffered as a result.
A recent example being the Council’s latest IT Strategy
report. The Civil Contingencies Act and resilience are not mentioned, yet resilience
of such a core facility, which is essential to all WSCC services, should be a
key strategic objective. If the Council cannot meet their legal obligations on
such a fundamental report, there is little hope of them setting an example to
others.
Finally, the inadequacy of the consultation. There are just
two sections on the ‘Plan’, one of which contains four questions designed to
get a favourable response, and the other is simply blank for additional
comments. Yet there are seven sections about the person submitting the
response!
There are no questions about the public’s views on
deteriorating fire engine availability, or on increasing failures to meet
response times. Both are of significant concern to the public and they are
entitled to be properly informed and invited to comment. They should also be
asked if they consider £33.68 per person per year is sufficient to spend on
their protection. I consider it inadequate and I am sure many others would
agree.
Firefighters continue to do a superb job, but the decreasing
support they receive from the County Council is a disgrace. The public also
deserve a much more open, transparent and accountable fire & rescue
service. This Community Risk Management Plan does little to meet those
objectives. Sadly, it’s inadequacies will simply strengthen the Police &
Crime Commissioner’s case to take control of the fire & rescue service."